Skip to main content
Home
All fields marked by symbol "*" are required and must be completed.

Search form

  • Home
  • Consultations
  • Surveys
  • Applications
  • FAQs
Home
ENEnglish
  • ENEnglish
  • GAGaeilge
  • Login to Portal
  • Register
    • Login to Portal
    • Register
    • Home
    • Consultations
    • Surveys
    • Applications
    • FAQs
    1. Home
    2. Consultations
    3. Draft Masterplan for Abbey Creative Quarter (Former Smithwick’s Brewery and Bateman Quay/Market Yard area)
    4. Appendix D - Flood Risk Assessment

    Appendix D - Flood Risk Assessment

    Draft Masterplan for Abbey Creative Quarter (Former Smithwick’s Brewery and Bateman Quay/Market Yard area)
    Closeddate_range23 Jun, 2015, 07:00 - 21 Jul, 2015, 18:00

    Appendix D - Flood Risk Assessment (Download Flood Risk Assessment)

    Share

    Contents

    Home
    • Public Notice
    • Masterplan Contents
    • Master Plan Section 1 - Introduction
    • 2.1 History
    • 2.2 Context of Kilkenny
    • 3.1 Masterplan Area Context
    • 3.2 Urban Planning Analysis
    • 4.1 Movement -revised
    • 4.2 Conservation
    • 4.3 Urban Design Strategy
    • 4.4 Sustainability
    • 5.1 Establishing a New Quarter
    • 5.2 Options Considered
    • 5.3 Final Urban Plan
    • Appendix A Environmental Development Provisions
    • Appendix B - Strategic Environmental Assessment (SEA) Non Technical Summary
    • Appendix B - SEA Environmental Report
    • Appendix - B Natura Impact Report
    • keyboard_arrow_right
      Appendix C - Draft Archaeological Report (DAR) Section A - Abbey Quarter executive summary and contents
      • Draft Archaeological Report (DAR) Section 1 Process and Methodology
      • DAR - Section 2 Understanding the site History and Chronology
      • DAR - Section 3 The archaeological context
      • DAR - Section 4 Understanding buildings fabric and surveys
      • DAR - Section 5 Context and Setting
      • DAR - Section 6 Conclusions
      • Abbey Quarter Masterplan Areas Report Appendices
    • Appendix D - Flood Risk Assessment
    • Appendix E - Spatial Content & Process Principles
    • Appendix F - Obervations on Urban Code

    Reports

    • fa-file-pdf
      Chief Executives Report Masterplan July 2015.pdf
      1.18 MB

    Contact

    • Contact us

    More

    • Moderation Policy
    • Privacy Policy
    • Cookie Policy
    • Terms and Conditions

    Connect with us

    fab fa-x-twitter
    fab fa-facebook-f
    fab fa-linkedin-in
    OpenConsult by CiviQ
    Copyright © 2026 CiviQ. All rights reserved.