Uimhir Thagarta Uathúil: 
CVQ-1172
Stádas: 
Submitted
Údar: 
An Taisce, Kilkenny Association

5.3 Final Urban Plan

Note that the maps in this section have poorly numbered buildings and are inadequately labelled.

The proposed phasing outlined is welcomed.

The development will take place over a long period therefore flexibility in the masterplan is desirable and there should be no finality about consultation.

Indeed public consultation should take place at the end of each phase to test the resilience of the masterplan and adjust it as required.

Plé
Fiafraigh / freagra a thabhairt ar cheist nó faisnéis a bhaineann leis an observation seo a roinnt.