Favour the development of renewable energy sources.
Current Status
Adopted Development Contribution Scheme 2015-2017 adopted 20th April 2015.
14 |
Wind Farm Developments > than 0.1 MW ( < than 0.1MW is exempt) |
Per MW € 5,000.00 |
Draft Proposed Changes
Proposed Changes in Draft Development Contribution Scheme 2016-2017.
14 |
Renewable Energy Developments > than 0.1 MW ( < than 0.1MW is exempt) |
Per MW € 10,000.00 |
My Submission
It is my submission that the Draft Development Contribution Scheme 2016-2017 be modified to read.
14 |
Non-renewable Energy Developments > than 0.1 MW ( < than 0.1MW is exempt) |
Per MW € 20,000.00 |
Kilkenny County Council should favour the development of renewable energy sources.