GeneralSubscribe to General

Contribution should be calculated after the identification and allocation of environmental costs: (input/outflow analysis, flow cost accounting, activity based costing and lifecycle costing).
Current Status Adopted Development Contribution Scheme 2015-2017 adopted 20th April 2015.


14 Wind Farm Developments > than 0.1 MW ( < than 0.1MW is exempt...
Introduction Section 48 of the Planning & Development Act 2000 as amended by Section 30 Planning and Development Act 2010 enables Local Authorities, when granting a permission...
  2.1   Description of Proposed Amendment No.2  2.1.1   Description of the Callan Local Area Plan The Callan Local Area Plan 2009-2020 (the Plan) has been prepared in accordance with the...